Dates Processing Plant [Rs. 92.99 million, Aug-2017]

Dates Processing Plant [Rs. 92.99 million, Aug-2017]
File Size:
691.48 kB
Date:
30 August 2017
Downloads:
4785 x

Dates processing plant is proposed to be located in District Panjgur while considering other mandatory inputs i.e. availability of human resource, electricity and water etc. Product include Processing & Packaging of Dates fruit. The Installed capacity of the plant is 800,000 Kgs per year of Dates and initial utilization is 65%.

Total Cost Estimates is Rs. 92,998,665 with fixed investment Rs. 88,435,791 and working capital Rs. 4,562,874.

Given the cost assumptions IRR and payback are 21 % and 5.28 years respectively

The most critical considerations or factors for success of the project are:

  • Dates processing units are recommended to be installed next to the growing area while considering other mandatory inputs i.e. availability of human resource, electricity and water etc.
  • Easy access to the consumer market is advised to be studied thoroughly and made a key consideration while setting up the project.
  • Proper fumigation & maintaining hygiene is of utmost importance.
 
 
 